ADR 0018 — Configurable verification gate and a bounded rework loop ​
- Status: accepted (2026-09-30). Built: MVP slice 2 (the core), slice 3 (configuration and the AG-UI projection) and slice 4 (the web), 2026-09-30, for the agent-checks source; see Built (slice 3) and Built (slice 4) below; and slice 10, 2026-09-30, the verifier agent (see Built (slice 10) below). Slices 5 and 6 (the inbox, and the CI webhook that makes
cia source this build honours) are built too, see Updated (slice 6). Amended 2026-09-30 (review of slices 6, 7 and 9): a gate that requirescimust name its checks, andciis honoured only where a webhook is mounted, see the status note; "the first completed CI report decides" below is superseded. Amended 2026-09-30 (the first live run): the agent's own checks pass only on the pushed commit, see the status note, which also has the rework prompt carry the person's messages, writes down the fence grammar of the prompts the core writes, and lists the holes that remain. Amended 2026-09-30 (threads never lock): the gate applies to each job of a thread; verifications are counted per thread, see the status note. Amended 2026-10-04 (the chat that is not a pull request): the gate verifies only pushed work: an agent that finishes its first attempt with nobranchartifact gave an answer, and the job is done, see the status note, which replaces the 2026-09-30 rule that failed it. Amended 2026-10-07 (the owner's exports of 2026-10-06): pushed work is verified in every attempt and job (a rework that exists only because abranchartifact could not be used is no longer a trap), "no pushed commit" is said before "no checks reported", and a failing check that fails on the base commit too (preexisting: true) passes with a note, see the status note. Amended 2026-10-08 (the owner's decision): the gate passes pre-existing failures in the shape the coder writes them too, a report marked as a whole, see the status note. Planned, not built: the web's card for CI (slice 8) (mvp.md). Refines ADR 0002 (how "verify" and "budgets" are made concrete). Closes open question 8 and answers part of question 6 (attempts; wall clock for the waits on CI and the verifier). Builds on ADR 0016 (the ledger and the loop's rules) and ADR 0017 (CI results).
Context ​
ADR 0002: an external judge decides quality, the loop is work, verify, rework with findings until green, bounded by budgets, and a job never ends "done" while its checks are red. MVP step 3 is that loop. Open question 8 asked where verification runs: real CI arriving by webhook, or a verifier agent over A2A; the proposed answer was to gate on real CI and allow a verifier for inner loops.
The owner decided on 2026-09-30:
- The gate is configurable over three sources: CI on the pushed SHA, checks the agent reports itself, and a verifier A2A agent.
- Attempts: 3 by default, configurable.
adam-coder does not report its checks today. Verified 2026-09-30 (adam-rs 882e239): it emits branch and pull_request artifacts, and run_checks emits no artifact. The agent-checks source therefore needs a cross-repository change (a checks artifact), approved as part of this choice. Until it lands, the coder's dev gate is CI only.
Decision ​
Sources, ports, aggregation ​
The sources are a closed enum, CheckSource: Ci, AgentChecks, Verifier. There is no new port: the aggregation (which sources are required, which have passed, whether to rework) is pure core logic in orch-core, the rules of ADR 0016.
| Source | Evidence | Arrives as | Passes when |
|---|---|---|---|
Ci | Reports on the pushed SHA (ADR 0017) | Input::CiReported | the CiPolicy says so: all required names pass. (The first completed report used to pass when no name was required; superseded 2026-09-30, see the status note.) |
AgentChecks | The agent's checks {passed, commit, summary?, findings?} artifact | the artifact, recognised in the core | passed is true and a commit was pushed and the checks ran on exactly that commit. (Without a pushed commit they used to pass; superseded 2026-09-30, see the second status note. Since 2026-10-04 the source is asked only about pushed work: with no branch artifact in the first attempt the gate does not apply at all, see the last status note.) |
Verifier | A verifier A2A agent's verdict {passed, findings[]} artifact | Input::VerifierReported | passed is true |
Two rules from the loop that matter here:
- A required source with nothing to check counts as failed rather than pending forever. With no pushed SHA, CI and the verifier fail with "no pushed commit". With
AgentChecksrequired and nochecksartifact by the time the agent completes, it fails with "no checks reported". (Since 2026-09-30 the agent's checks need a pushed commit too: with none they fail with "no pushed commit", like the other two. Since 2026-10-04 that failure is for a rework that pushed nothing and for abranchartifact the gate could not use; an agent that pushed nothing in its first attempt is not asked at all, see the last status note.) - A failed source ends the round at once: the thread reworks (or fails) without waiting for the others. A result that arrives later for an older SHA or attempt is recorded and changes nothing.
The verifier ​
RequestVerificationbecomes a new outbox kind,verify, with a new columnoutbox.task_id(migration0003, slice 2). The dispatcher sends to the verifier's endpoint in a context of its own,<thread>-verify-<attempt>-<verification>(amended 2026-09-30, slice 10: the text first said<thread>-verify-<attempt>; see Built (slice 10)), so the verifier's A2A context is separate from the worker's.- The dispatcher never maps a verifier's envelopes to
Input::Agent: a verifier is not the worker, and its "completed" must not complete the job. It emits exactly oneInput::VerifierReported, from averdictartifact{passed, findings[]}. No verdict is a failed check with "no verdict". - A verifier failure, or
ORCH_VERIFIER_TIMEOUT_SECS, puts the thread inBlocked, notFailed: the verifier being down is not the code's fault, and it does not spend an attempt. - The verifier is another configured agent (
AGENTS_FILE); it never receives the worker's credentials.
Configuration ​
Three layers, from widest to narrowest. Each layer may only tighten the one above.
| Layer | Where | What |
|---|---|---|
| Deployment | env | ORCH_GATE (comma list, e.g. ci,agent-checks; default empty, which is today's behaviour), ORCH_MAX_ATTEMPTS (3), ORCH_MAX_ATTEMPTS_CAP (10), ORCH_VERIFIER (agent id), ORCH_VERIFIER_TIMEOUT_SECS (1800), ORCH_CI_TIMEOUT_SECS (3600, ADR 0017) |
| Target | an AGENTS_FILE entry | gate: {require: […], maxAttempts, verifier: <agent id>, ci: {required: […], timeoutSecs}}, parsed with deny_unknown_fields. The verifier must be another configured agent, checked at startup (a bad reference is exit 78) |
| Thread | AG-UI forwardedProps["vymalo.gate"]; MCP start_job.gate | A thread may add sources and change attempts up to ORCH_MAX_ATTEMPTS_CAP; it may not remove a source its target requires |
The gate in force is resolved when the thread is created and copied into Job (ADR 0016); a running job never sees a later configuration change.
Defaults chosen (the owner's decisions, and the plan's defaults): the gate is empty; 3 attempts, capped at 10; a timeout blocks the thread rather than spending an attempt; without ci.required, the first completed CI report decides (superseded 2026-09-30: a gate that requires ci must name its checks, see the status note below); a per-thread gate can add sources but not remove them.
Findings ​
- Findings are capped at 20 items and 16 KiB per source.
- They are quoted as untrusted data in the rework prompt (delimited, and labelled as coming from a check, not from the user): a CI summary or a verifier's text is input from outside.
- The findings text is built in the core, so it is the same on every replica and in every replay.
Projection to the chat ​
AG-UI (ADR 0012; the mapping tables in api/agui.md gain these rows when built):
- A run stays open while the thread is
Queued,WorkingorVerifying. completedinto verifying emitsSUBAGENT_FINISHEDand aSTATE_SNAPSHOT(the thread plusjob {attempt, maxAttempts, gate, sha}), notRUN_FINISHED.check_resultbecomes the activityvymalo.check.reworkbecomesvymalo.rework, thenSUBAGENT_STARTEDfor the next attempt.- The verifier appears as its own subagent.
DonegivesRUN_FINISHEDwith success. Out of attempts givesRUN_ERRORwithcode: "checks_failed".
chat-api.yaml: Thread.state gains verifying, plus an optional job. Two new goldens, verify-green and verify-red, are read through the reference client in CI. The web shows a verifying badge, an attempt counter such as "2/3", findings per source and a "reworking" divider.
Diagrams ​
One job, from the agent's completion to green, through one rework:
sequenceDiagram
participant W as Worker agent (A2A)
participant O as Orchestrator (transition, pure)
participant CI as CI (webhook)
participant V as Verifier agent (A2A)
participant U as Chat
W-->>O: artifacts branch{sha1} and checks, then completed
O->>O: gate requires ci and verifier: Verifying, Watch ci:repo@sha1
O-->>U: check_result pending (ci), pending (verifier)
par CI
CI-->>O: CiReported sha1 = failure
and verifier
O->>V: verify (context thread-verify-1-1)
V-->>O: verdict {passed: true}
end
O->>O: ci failed, attempt 1 < 3: rework
O-->>U: check_result failed (findings), rework 1 of 3
O->>W: Delegate with the findings, quoted as untrusted
W-->>O: artifacts branch{sha2} and checks, then completed
O->>O: Verifying at attempt 2, Watch ci:repo@sha2
CI-->>O: CiReported sha2 = success
O->>V: verify (context thread-verify-2-2)
V-->>O: verdict {passed: true}
O->>O: all required sources passed: Done
O-->>U: RUN_FINISHED successstateDiagram-v2
[*] --> Queued
Queued --> Working: the agent reports working
Working --> Done: completed, gate requires nothing
Working --> Done: completed, nothing pushed (an answer, 2026-10-04 and 2026-10-07)
Working --> Verifying: completed, gate requires sources
Verifying --> Done: every required source passed
Verifying --> Queued: a source failed, attempt < max (rework, attempt + 1)
Verifying --> Failed: a source failed on the last attempt
Verifying --> Blocked: ci_timeout, verifier failure or verifier timeout (no attempt spent)
Verifying --> Queued: a user message (no attempt counted)
Verifying --> Cancelled: cancel
Blocked --> Queued: a user message
Done --> [*]
Failed --> [*]
Cancelled --> [*]Queued and Working also reach Blocked, Failed and Cancelled exactly as in Thread state; the diagram shows only what the gate adds. What it cannot say: a Blocked thread that the user answers is delegated again without a new attempt number, because the timeout was not the worker's failure; an out-of-attempts Failed carries the last findings in its error event.
Built (slice 3) ​
2026-09-30. What the code does, where it refines the text above:
- Configuration is one rule set,
GateRulesinorch-app(gate_config.rs): the binary applies the deployment variables and everyAGENTS_FILEentry with it at startup, andAppapplies the entry and the request when a thread is created;App::newchecks the deployment's policy and every entry again, so another composition root cannot hand it a gate the build cannot honour (it returns an error; the binary exits 78). A layer is{require?, maxAttempts?, verifier?, ci?}. What "each layer may only tighten the one above" comes to in code: sources can only be added (requireis the whole list and must contain the one above's;ci.requirednames add up), and attempts can be anything in1..=ORCH_MAX_ATTEMPTS_CAP(at most 100), lower or higher than the layer above's. The one removal allowed is the entry of the verifier itself leaving theverifiersource out for itself, because an agent cannot verify its own work; an agent whose own gate does not require the verifier may be the verifier. A thread may set onlyrequireandmaxAttempts, and spells a sourceagent-checksoragent_checks. A defaultORCH_MAX_ATTEMPTSis lowered to a smallerORCH_MAX_ATTEMPTS_CAP; one that is set must fit. The verifier of every agent's resolved gate must be a configured agent. - This build honours only
agent-checks(as slice 3 left it; it honoursverifieras well since slice 10, see Built (slice 10), andcisince slice 6, see Updated (slice 6)). The application still dropsRequestVerification(slice 10;WatchandScheduleare executed since slice 5, but no surface writes CI reports until slice 6), so a gate that requiredciorverifierwould wait for a verdict that never comes. Configuration refuses those sources, and theciandverifiersettings, in every layer, and says which slice enables them: startup exits 78 (ORCH_GATE,ORCH_VERIFIER, anAGENTS_FILEentry), a request is a 400. This is fail-closed: a job is never "done" without a check the operator required.pending_reasoningate_config.rsis where the sources are listed, andGateRules::honouringhow a build (or a test) says it has more. It is not the only thing a later slice changes: the slice that makesverifierreal also owns its checks (GateRules::check_verifier, the verifier's own entry) and its cards, and the one that makescireal owns thecisettings and the watch keys. - Not built yet:
ORCH_CI_TIMEOUT_SECSandORCH_VERIFIER_TIMEOUT_SECS, which only matter once CI and the verifier can be required (slices 6 and 10); the per-targetci.timeoutSecsis accepted by the parser and refused with the rest of thecisettings. (Update 2026-09-30: slice 10 readsORCH_VERIFIER_TIMEOUT_SECSand honours the verifier, see below; the rest of this paragraph and the one before it are as slice 3 left them, for thecisource.)(Update 2026-09-30:ORCH_CI_TIMEOUT_SECSand the per-targetci.timeoutSecsare read since slice 6, see Updated (slice 6).) - Projection: as above. The gate reaches the projection through
ThreadMeta.gate(the job's copy, fixed when the thread was created); everything else is folded from the log. Thevymalo.checkcard of a source in an attempt has a stable id,check-<attempt>-<verification>-<source>, and isreplace: true(a second verification of the same attempt is a card of its own);vymalo.reworkisrework-<attempt>; a rework opens the next attempt's subagent at once.jobis inSTATE_SNAPSHOTand inThreadonly under a gate, and itsshais the pushed commit, never the commit a check ran on. A hold (error{retryable}thenblockedwhile verifying) is an answerable interrupt, notdelivery_failed. Goldens:verify-green(red once, then green),verify-red(three attempts,checks_failed). - A rework is a new A2A task in the same context, because the first task is
completed;orch-e2epins it. - The gate is fixed at creation, and a run that continues a thread and asks for another is a 409 (
orch-surface-agui), not a silent no-op.
Built (slice 4) ​
2026-09-30. The web (web/) renders the gate; it invents nothing, so each thing below is read from the stream:
- The badge has a
verifyingstate (its own colour and label, "Verifying", spoken as "Verifying the agent's work"), and the composer offers Cancel while it lasts. - The attempt counter ("Attempt 2/3", spoken as "Attempt 2 of 3") sits beside the badge whenever the newest
STATE_SNAPSHOT(or, before the stream,Thread.job) carries ajob; a thread without a gate shows none. vymalo.checkis a card per source and attempt (status in words, source, short commit, summary and findings), replaced in place by its id; astaleone is its own muted card.vymalo.reworkis a divider, "Attempt 2 of 3: sent back with 1 finding". Findings, summaries and names are untrusted and drawn as text: never as markdown or HTML; a long finding is cut with an expand control.RUN_ERRORchecks_failedis kept by the stream's agent and shown as "Checks failed after 3 attempts" where an ordinary finished thread says "This thread is failed".- The mock replays both goldens (and
verify-pass, and the mock-onlyverify-ciandverify-wait, which need the CI source of slices 5 and 6); the system tests run the fake agent'sverify-*scripts through the real orchestrator. Rules and tests:web/README.md.
Updated (slice 6) ​
2026-09-30. This build honours ci and agent-checks; verifier is still refused until slice 10.pending_reason(CheckSource::Ci) is None: the CI webhook (ADR 0017) writes reports into the inbox that slice 5 built, so a gate that requires ci can be decided. The ci source and the ci settings (ci.required, ci.timeoutSecs) are accepted in the deployment (ORCH_GATE, ORCH_CI_TIMEOUT_SECS) and in an AGENTS_FILE entry, and refused per thread as before (ci cannot be set by a request; require: [ci] can be added by one). verifier and its setting are refused in every layer with the slice that enables them. Whether a deployment can receive reports is ORCH_SURFACES: a ci gate with no webhook mounted is not refused (another replica group may serve the webhooks), it ends Blocked (ci_timeout) after the timeout, and a control plane warns at startup.
Built (slice 10) ​
2026-09-30. The verifier is a real source. What the code does, where it refines or departs from the text above:
- The request.
RequestVerificationis an outbox row of kindverify(OutboxPayload::Verify: the attempt, the verification, the verifier's id, what was pushed and the prompt the core wrote). It is written in the same commit as theVerifyingtransition and theVerifierDeadlinetimer, so it cannot be lost or made twice. Averifyrow is not ordered like a delegation: it is not held back by the delegate whose completion caused it (still being finished), and it holds back none. - The context is
<thread>-verify-<attempt>-<verification>, not<thread>-verify-<attempt>(a deviation from the text above, which had only the attempt). A user who writes during a verification, or a hold the user answers, makes the worker finish again in the same attempt, and the verification that follows is a new one: it must not land in the A2A context of a verification that is over. The job'sverificationcounter is unique per job, so the context is unique too.orch_core::verifier_contextbuilds it. - What the verifier is sent (the core writes it,
verifier_prompt): the commit (a hash, the one thing outside a fence), the attempt ("attempt 2 of 3"), how to answer (averdictartifact), and three quoted blocks, each in a fence the text cannot close and labelled as data, not instructions to the verifier: where the worker says it pushed the commit (its repository and its branch), the user's messages in the order they wrote them (the job'stask, see the status note of 2026-09-30), and what the worker said about its work (its last final message in this attempt; the text of itscompletedreplaces that when it is not blank; at most 4 KiB;Job.summary, kept only under a gate that requires the verifier and forgotten at a rework). Everything the worker controls is inside a fence, and the branch is also refused unless git would accept it (git check-ref-format --branch: no whitespace, control characters or any of`~^:?*[\, no..,@{, empty component, leading-, trailing/,.or.lock, at most 255 bytes); an artifact with another branch is logged as malformed and pushes nothing. The repository is the ledger's normalised key (host/owner/name, no scheme: whatrepo_keymakes of the address the worker reported), not the address as the worker wrote it; a verifier that needs a clone URL builds it from the host. It never receives the worker's credentials: it is another configured agent with its owntokenEnv. - The task is on the row.
outbox.task_idholds the verifier's A2A task once its first envelope arrived (ThreadStore::mark_verify_sent, fenced by the claim and never touching the thread's binding, which is the worker's). A re-claimed row re-attaches to that task (resubscribe, thenget_task); one that crashed between sending and recording looks the message up by its id (find_task_by_message, tried up to three times when the lookup itself fails) and sends the request again only when the lookup answers that there is no such task. The verifier is asked at most once when it supportsListTasks; otherwise (the lookup cannot be answered) the row is retried and, in the end, the thread is held for the user rather than asking again, and the unique context andmessageIdare what lets a verifier that saw the request twice tell. A resubscription yields the rest of the stream, not what came before it, so a task that completes there without a verdict is read withget_task(its artifacts) before "no verdict" is concluded: a verdict streamed before a crash is not lost. - Envelopes are read, not applied. The dispatcher's verify path reads the verifier's stream and never maps it to
Input::Agent. It keeps the latestverdictartifact and, when the task ends its turn, feeds exactly one input:Input::VerifierReportedwhen it completed (noverdictisVerdict::missing(), one that cannot be read (passednot a boolean,findingsnot a list, not JSON, over 256 KiB) isVerdict::unusable(why): both fail the check, fail closed, and say "no verdict"), orInput::VerifierFailedwhen it failed, was rejected or cancelled, asked for input nobody can give, could not be reached after the delegation's retries, refused the request, or is no longer configured.VerifierFailedis new (a deviation: the text had the dispatcher reuseDeliveryFailed, which carries no verification, so a late failure of a verification that is over could have held a thread that had moved on). It names the attempt and the verification like the verdict does, and holds the thread (Hold::VerifierFailed,Blocked, no attempt spent) only when that verification is the one waiting. - Findings are capped where they are read (
parse_verdict: 20 items and 16 KiB, a finding that is not a string is kept as its JSON) and again where the verdict is applied, and they reach the worker only quoted as untrusted. - Stale answers change nothing except a stale
check_result: the verdict is applied under the keyverdict:<row>(one verdict is one event whoever applies it, a replay isDuplicate), carries its attempt and verification, and the core compares both. The row also watches its thread (DispatcherConfig::verify_watch, 5 s): when the verification is no longer the one in progress (a timeout, a cancel, a message from the user, another source that already failed the round) it asks the verifier to stop (CancelTask, best effort, when it has the task's id) and ends the rowskipped, so a verifier that hangs does not hold a worker for ever. The look happens between two envelopes or two polls, never in the middle of a write: a request that has been sent is recorded before anything else, and a verdict that is being committed is finished, not cancelled.ORCH_VERIFIER_WATCH_SECS(5, at least 1) sets how often. - The wait is bounded by the core's timer.
ORCH_VERIFIER_TIMEOUT_SECS(1800, at least 1;GatePolicy'sverifier_timeout, deployment-wide) is armed as a slice 5 timer by theSchedulethe core emits with the request; when it fires the thread isBlockedwithHold::VerifierTimeout, the attempt is not spent and the row is dropped as above. - Fencing. Every write of the path is fenced with the outbox claim, like the delegation path: recording the send, the retries, the verdict or failure (
App::applywith the lease), the end of the row. A worker that lost its claim writes nothing;orch-app's tests pin it with a claim taken over while the verifier answers. - Configuration.
pending_reasonno longer refusesverifier:ORCH_GATEmay name it,ORCH_VERIFIERand theverifierkey of anAGENTS_FILEgateare read, andORCH_VERIFIER_TIMEOUT_SECSis read; the other rules of slice 3 stand (a verifier must be a configured agent, a thread may require it but not choose it, and an agent whose resolved gate requires the verifier cannot be the verifier itself, whether by the same id or by another id for the same card URL, unless its own entry leaves the source out). A request that requires the verifier is checked against the same rules once it is applied, so a thread that asks for it where no verifier is configured, or on the verifier itself, is a 400 before anything is created (not a job that fails its check later); the MCP server'sstart_job.gategoes through the sameApp::resolve_gate, so it is refused the same way.cistays refused, with its settings, until slices 5 and 6 of the CI plan land. - Projection. The verifier is a subagent of its own, named after the verifier agent, with the stable id
sub-verify-<verification>: it starts with thependingcard of the verifier source and ends with its verdict (SUBAGENT_FINISHEDwithresult: {"passed": …}), or, when the verification ends without one (the round was decided by another source, the user wrote, the thread was cancelled), withresult: {"status": "canceled"}, or, when the thread was held while the verifier was out and no CI is required (so the hold can only be the verifier's: it failed, was refused, or was too slow), withSUBAGENT_ERROR(code: "verifier_failed", the hold's message). A client that joins while the verifier is out is told about its subagent in the preamble. The verdict is avymalo.checkcard with sourceverifier. Goldens:verify-verifier-green(findings once, then green) andverify-verifier-red(three attempts,checks_failed). - Not built. When CI is a required source too, a timeout or a failure of the verifier is still shown to its subagent as cancelled, not as failed: the projection cannot tell from the log which source the hold was about, and the interrupt says why. CI remains unbuilt;
AgentChecksstill needs adam-coder'schecksartifact (cross-repository). - Dev stack.
mock-verifier(WireMock; findings for a commit of fortya, a pass for any other), the coder'spush-flawedandpush-cleankeywords,verifierandmock-coder-verifiedindev/agents.yaml, anddev/verifier-e2e.sh.
Status note (2026-09-30): review fixes ​
cirequiresci.requirednames. Replaces "withoutci.required, the first completed CI report decides" (Decision, Defaults chosen) and theCirow of the sources table. With no names the first report for the pushed commit decided, so askippedreport of another check, another workflow's, or a fork's, passed a red commit (ADR 0017).GateRulesnow refuses, as aGateError::CiWithoutChecks, a resolved policy that requiresciand names no check: the deployment (ORCH_GATEwithoutORCH_CI_REQUIRED) and everyAGENTS_FILEentry at startup (exit 78), a per-threadrequirethat addscion a policy with no names as a 400 (or a tool error over MCP). Names union across layers as before, so a layer cannot drop the ones above. The core is fail-closed too: with none named, no report counts and the CI deadline blocks the job.ciis honoured only with a webhook surface.GateRules::refusing(Ci, reason)is how a deployment refuses a source of its own: the binary uses it when a process that serves routes mounts neitherwebhook-genericnorwebhook-github, with the reason "no CI webhook surface is mounted (ORCH_SURFACES)", for the deployment, for agents and for per-thread requests. Replaces the startup warning of slice 6 ("acigate with no webhook mounted is not refused"). Aworkerserves no routes and honours what the control plane decides.- Configuration.
ORCH_CI_REQUIRED(comma-separated check names) sets the deployment'sci.required. - The
vymalo.checkcard of sourcecicarries the summary of the check when exactly one is named.
Status note (2026-09-30): the agent's checks need a pushed commit ​
Why. On the owner's first live run (real model, real GitHub, dev/agents.live.yaml, the coder gated on agent-checks) the owner typed "Hi". The coder answered in plain text and completed; the gate sent it back with "no checks reported". On attempt 2 the model invented a task on a repository nobody asked for and ran run_checks on the unchanged worktree. That produced a passing checks artifact bound to the base HEAD, no branch artifact and no pushed commit, and the thread ended Done ("Attempt 2/3"). Nothing had been produced, and the gate called it finished.
What was wrong. agent_checks compared the checks' commit with the pushed one only when both existed. With no pushed commit, or with checks that named none, the comparison was skipped and the checks' own passed decided. That contradicts ADR 0003 (git is the artifact: what the agent did is the commit it pushed) and this ADR's own table ("passed is true for the pushed commit"), and it was the one source of the three that did not fail closed on a missing push. CI and the verifier already did.
The rule now. A job gated on agent-checks is done only when the checks passed on the pushed commit:
| What the job holds when the agent finishes | The source says |
|---|---|
no checks artifact | failed: "no checks reported" (unchanged) |
| checks, but no pushed commit | failed: "no pushed commit: the agent reported no branch artifact, so there is nothing to check", the same finding CI and the verifier give; when the agent did send a branch artifact that the gate could not use (a short hash, a repository that is no address, a branch git refuses), the finding is instead "the branch artifact was not usable: <reason>" (Job.branch_problem, cleared by a usable branch and by a rework), so the agent hears what to fix; if the checks themselves failed, their findings follow it, so the agent sees both. A refused report's own summary is not shown (a "42 tests pass" beside a failure reads as praise) |
| checks and a pushed commit, but the checks name no commit | failed: "the checks name no commit, so they cannot be tied to the pushed commit <sha>" (an unreadable checks artifact keeps its own reason, which already fails) |
| checks that ran on another commit than the pushed one | failed: "the checks ran on commit A but the pushed commit is B" (unchanged) |
| checks that passed on the pushed commit | passed |
(Superseded 2026-10-04 for a first attempt that pushed nothing, see the last status note: the table below is what the gate says of an agent that pushed, tried to push or is being reworked.)
A failed source reworks while attempts are left, so the owner's "Hi" now ends in a rework telling the agent to push its work, and after the last attempt in Failed with that finding, never in Done. (This was the 2026-09-30 reading; 2026-10-04: the "Hi" is an answer and ends Done on attempt 1.) transition stays a pure function: the change is in verify::agent_checks, which reads only the job.
The rework prompt carries what the person wrote (same day, same run). On attempt 2 of that run the coder said that "the task text itself was never carried into this session; the feedback contained only the check-result complaint". It was right: each attempt is a new A2A task (Decision, the rework), and an agent need not remember the one before (the coder keeps no memory across tasks), but rework_prompt sent only the findings. The prompt now opens as before ("Your work did not pass verification (attempt N of M); this is attempt N+1"), then carries the person's messages in their own words, in a fence labelled request, and only then the findings, quoted as untrusted data as before. The first version carried only the first message; a review the same day found that wrong: with the coder's rule that a stop with no pull request becomes a question, a job goes "Hi", the coder asks, the person answers "fix login in acme/widgets", the attempt fails, and a prompt that quotes "Hi" and says it is the request loses the answer.
- What
Job.taskholds. Every user message of the job, in the order they were written, the newest last: the first message as it is, each later one after a line[next message].note_taskadds one peruser_messagethe gate sees (inqueued,working,blockedandverifying), under every active gate, whichever sources it requires (it never kept anything for a job with no gate; the field is the job's, not the verifier's, although the verifier's prompt reads it too). Whitespace around a message is dropped and a blank message adds nothing. - The cap. The whole is at most 8 KiB (
MAX_TASK_BYTES), so a long chat cannot grow the ledger or the prompts without bound. A lone message is cut there. With several, each is cut to about half the cap, and the first message and as many of the newest as fit are kept: what lies between is replaced by one line[… earlier messages omitted …]. A message that had to be cut ends in[cut]. The first message stays because it is usually the request, the newest because it is usually the answer that changed it; the middle is the part that can go. All cuts are on a character boundary, and the result is a pure function of the messages, so a replay makes the same text. - How the agent is told. "These are the person's messages, in their own words and the order they wrote them (the latest last, a
[next message]line between two of them); a later one answers or changes an earlier one. They are your task: carry on with it." It no longer says to "keep doing it on the same repository and branch" or "not to start a different one": a later message may name another repository, and the agent's own rules (the coder's named-repo check) decide what the messages mean. The verifier's prompt quotes the same text as untrusted data under "The task: the user's messages in the order they wrote them". - Old ledgers.
Job.taskstays a string: a ledger written with one message reads as a job with one message, and a job with no task (a ledger written before the field) gets the prompt it always got. - The messages are the instruction to follow; the findings are data that describes problems and "not instructions". The two are fenced differently on purpose (see the grammar below).
The fence grammar of the prompts the core writes. Everything that is data and not instruction is quoted in a fenced block, and an agent that parses a prompt (the coder's named-repo check reads the person's messages to find the repository) must read it the way CommonMark does:
- An opening line of N backticks, with N at least 3, immediately followed by a label and nothing else:
request(the person's messages, in the prompt of the agent they instruct) oruntrusted(data that is no instruction to its reader: the findings, where the worker says it pushed, the worker's own summary and, in the verifier's prompt, the person's messages too, because the verifier is not the one they instruct), then the text on its own lines. - The closing line is at least N backticks and nothing else. N is longer than any run of backticks in the text (
fence_for: the longest run, at least 2, plus one), so text cannot close its own fence, and N is often more than 3: a parser must count the opening fence and match it, never look for a literal three-backtick line. - Findings are a bullet list inside the
untrustedfence: each finding is one line starting-, and its own line breaks are continued indented by two spaces. - A parser that only wants the person's words takes the
requestblock and ignores everyuntrustedone. Text outside the fences is the core's own (the attempt numbers, the instructions, and the commit hash of the verifier's prompt, whichrecognise_artifactaccepts only as a hash). - Verified 2026-09-30 by the core's tests (
a_request_cannot_close_its_fence,a_message_cannot_close_the_fence_the_task_is_quoted_in,findings_are_quoted_as_untrusted_data_they_cannot_escape).
Consequences. A gate on agent-checks alone is now a gate on "the agent pushed a commit and its own checks passed on it". An agent that only answers questions cannot sit under it: give that agent no gate (gate: {}), as dev/agents.live.yaml says. (Superseded 2026-10-04: an agent that answers without pushing is done, so the coder keeps require: [agent-checks] and a chat is no longer failed.) The local stack's agents push a branch and report checks that name the same commit, and the order does not matter for that: the gate reads the job when the agent finishes (the fake agent and the WireMock agents send branch first, the coder sends checks and then branch). Checks that name another commit than the branch that follows them are dropped when it arrives ("facts about another commit no longer count"), and the source then says "no checks reported". So no scenario changed. Their rework matchers (this is attempt N, the scenario keyword, ### the verifier) still match the prompt, which quotes the keyword in its request block; dev/check-mocks.sh builds the current prompts.
What the gate still does not check. The rules above make "done" mean "a commit was pushed and the source that looked at it passed". They do not make it mean "the right commit, in the right place":
agent-checksis the agent vouching for itself. It passes when the agent says its checks passed on the commit it says it pushed. A model can report both falsely; nothing here looks at the commit. Onlyci(the commit's own checks, reported by the CI system) and theverifier(another agent that reads the commit) see it independently, which is why a gate onagent-checksalone is the weakest of the three and meant for inner loops.- The repository is not compared with the request.
pushed.repositoryis whatever the agent reported (put throughrepo_key). The orchestrator does not check that it is the repository the person named, or any repository at all that the deployment allows. The agent's own rules (the coder's named-repo check) and the verifier are what stand between a wrong repository and "done". commit == baseis not refused. An agent that reports the commit it started from, with checks that name it, passes: the orchestrator does not know the base commit, and a rule that refuses an unchanged tree needs the clone. The verifier, which reads the diff, is what catches it.- The branch artifact is the agent's word (its shape is checked, including by
git check-ref-format; that the commit exists on that branch of that repository is not).
Status note (2026-09-30): threads never lock ​
ADR 0020: a message on a finished thread starts the thread's next job, so a thread runs the gate once per job.
- The gate is per job, and it is the thread's.
Job::next()keepsgate(fixed when the thread was created; a per-job override is open question 31) and gives the new job attempt 1, so the budget (max_attempts) is per job: a follow-up after a job that used all its attempts has all of them again. Job.verificationis counted per thread, never reset. A report or timer names(attempt, verification); attempt 1 of job 2 must not match attempt 1 of job 1, and because the count only grows, a verdict, aCiDeadline, aVerifierDeadlineor averifyrow of an earlier job is stale by the comparison the core already makes. Nojobfield was added to any of them.- What is cleared for the new job:
results,pushed,summary,hold,branch_problem,task(the new job's task is the new message, then accumulates as in the previous status note). A CI report for an earlier job's commit is only a card (about_the_pushcompares the new job's pushed commit). - Rework is unchanged inside a job; the verifier still gets no reference to earlier tasks (ADR 0021).
Status note (2026-10-04): only pushed work is verified ​
Why. On 2026-10-04, live, the coder was gated with require: [agent-checks] (deploy/chart/values.yaml). Someone asked it "plot an image in TypeScript and show it here". It built a scratch project, its checks passed, it shared the PNG and answered. The gate then failed it ("no pushed commit: the agent reported no branch artifact, so there is nothing to check"), reworked it twice (each rework a new task, so the scratch workspace was gone) and ended the thread Failed. The 2026-09-30 rule below it was written for the owner's "Hi", where an agent invented work and called it done; it closed that hole by treating a missing push as a failed check, and in doing so made every coder chat that is not a pull request (a question, a demo, "what is this repo about") end Failed. That contradicts docs/vision.md ("the coder should not push every chat toward code").
The decision (the owner, 2026-10-04): gate only pushed work. Git is the artifact (ADR 0003); a job that left no commit left nothing for a source to judge. The gate is a judge of commits, not of answers.
The rule now. When the agent finishes (completed), verify::is_an_answer reads the job:
| What the job holds when the agent finishes | The gate |
|---|---|
no usable branch artifact, attempt 1 (whatever else was reported: no checks, passing checks, failing checks, an unreadable checks artifact) | does not apply: the job is Done on attempt 1, nothing is sent back, no source is asked, no timer or watch is set |
a branch artifact the gate could not use (Job.branch_problem: a short hash, a repository that is no address, a branch git refuses) | applies: failed with "the branch artifact was not usable: <reason>", as before. The agent tried to push and got it wrong |
a usable branch artifact | applies exactly as before: the agent's checks on that commit, CI, the verifier, reworks and the attempt budget |
attempt 2 or later, no usable branch artifact | applies: failed with "no pushed commit", as before (see below). (Refined 2026-10-07: only when an earlier attempt pushed a usable commit; see the last status note.) |
A rework is not an answer. The fourth row is a refinement of the owner's rule, kept on purpose and cheap to remove: a job reaches attempt 2 only because attempt 1 pushed, or tried to push, work that did not pass. If finishing that rework with nothing pushed ended Done, an agent could leave a red gate by pushing nothing, and the gate would verify only the work that is good. So no pushed commit still fails a rework, with the finding it always had. It never fails a first attempt that pushed nothing. A job that was reworked and then stopped by the person starts its next job at attempt 1 (ADR 0020), where the rule applies afresh.
What the log says. transition stays a pure function: the decision is verify::is_an_answer over the job, called from completed before a verification is started. The thread goes from working straight to done: one thread_state event done, the agent_status completed, no check_result, no rework, no error. A check_result would have to say passed, failed or pending about work that does not exist, and the UI would draw a card for it; the honest record of "nothing was pushed, so there was nothing to verify" is the absence of a verdict (the web shows no Checking the work… pill and no check steps, only the agent's answer). Job.verification is not counted either: no verification started. The AG-UI projection says the same: it used to send a STATE_SNAPSHOT verifying at every completed under a gate, and it now asks the one rule the core asks (orch_core::is_answer(pushed, branch_refused, attempt), from the branch artifacts it has seen) before it does, so the stream goes from SUBAGENT_FINISHED to STATE_SNAPSHOT done and RUN_FINISHED with no verifying and no card (api/agui.md). No event, field or wire name was added, so no schema, golden or client changed.
What replaces what. This supersedes, for a first attempt that pushed nothing, the 2026-09-30 rule that "checks, but no pushed commit" is a failed source and that the owner's "Hi" ends in a rework and then Failed (the 2026-09-30 note). Everything else in that note stands: checks count only on the pushed commit, the rework prompt carries the person's messages, the fence grammar, and the list of what the gate still does not check. The "Hi" case that note was written for is Done on attempt 1 with the agent's reply, which is what gate.rs of the app's tests now asserts (the test that said "checks with no pushed commit never end the thread done" was rewritten, not deleted: it pinned the old rule).
The cost, said plainly. The gate can no longer tell an agent that forgot to push from an agent that answered. A coder asked for a pull request that finishes without a branch artifact ends Done with no pull request, as a chat would. What stands between that and the person is the agent's own answer (the coder says what it did), the chat, and the person's next message, which starts the next job under the same gate. A deployment that wants "every job pushes" has no option for it: that would be a new gate setting (a source or a flag), proposed on its own if the owner wants it.
Threads in flight. A thread that was reworked under the old rule is at attempt 2 or 3 with nothing pushed and keeps failing on "no pushed commit" if its agent keeps pushing nothing; a thread that is Verifying is unaffected. New jobs get the new rule.
Verified 2026-10-04 by the core's and the app's tests: an_agent_that_pushed_nothing_and_reported_no_checks_gave_an_answer, an_agent_that_pushed_nothing_and_whose_checks_passed_gave_an_answer, an_agent_that_pushed_nothing_and_whose_checks_failed_gave_an_answer_too, an_unreadable_checks_artifact_does_not_make_an_answer_a_failure, a_branch_artifact_the_gate_cannot_use_is_a_failed_push_not_an_answer, a_push_is_verified_exactly_as_before, a_rework_that_pushes_nothing_is_not_an_answer (crates/core/tests/gate.rs), the property test's rule (4) and (4b) (gate_props.rs: done only when every required source passed, except an answer, which has no verdict), the projection's an_agent_that_pushed_nothing_is_done_and_the_thread_is_never_said_to_be_verifying and a_rework_that_pushed_nothing_is_still_said_to_be_verified (crates/agui-projection/tests/verify.rs), and the app's an_agent_that_pushed_nothing_gave_an_answer_and_the_thread_is_done, a_branch_artifact_that_is_unusable_fails_with_its_reason and pushed_work_is_verified_and_a_rework_that_pushes_nothing_is_not_an_answer (crates/app/tests/gate.rs).
Status note (2026-10-07): pushed work is verified in every attempt, and a failure on the base is a note ​
Why. The owner's production exports of 2026-10-06 and 2026-10-07 show the gate failing work that was never pushed, and failing work for a failure it did not cause:
- A ("Who's Christian Yemele?", a fork, job 4): the coder built and ran a script in a scratch project, its own checks passed, it pushed nothing and reported no
branchartifact. The gate answered with "no pushed commit: the agent reported nobranchartifact, so there is nothing to check", reworked it twice and ended the threadFailed. The OSINT thread did the same, then blocked asking for a repository. - B ("What is this repo about?", job 2, "Can you investigate more?"): an investigation only; the gate said "no checks reported: no
checksartifact came before the agent finished" and reworked it. - C (the same thread, job 1):
yarn checkfailed on errors the repository already had; three attempts were spent and no pull request came.
What the code did, read 2026-10-07 (verify.rs, gate.rs, transition.rs). is_an_answer was !pushed && !branch_refused && attempt <= 1. Every route into a gated attempt 1 needs a pushed ref or a branch_problem: a first attempt with no branch artifact at all is Done (the core's an_agent_that_pushed_nothing_* tests, and the app's, pin it), and Job::next resets the attempt to 1 and forgets pushed, results and branch_problem for every new job, a fork's included. So the finding of the exports ("no branch artifact", on every attempt) can only be what attempt 2 and 3 say: once a job is at attempt 2 the rule did not apply any more, and the question the agent could not answer (push what, in a scratch project?) failed it again, twice, whatever it did. Two defects follow from the code, and are fixed here; the first trigger of A and B, an attempt 1 that was gated, cannot be reproduced from the core alone and is unverified: it needs a branch artifact in that attempt (a usable one, or one the gate refused), which the exports' artifact events would show. Whoever reads them next should look for it (open point below).
attempt <= 1was a proxy. The rule's reason is "a rework exists because a push failed: the pushed branch is still the work". An attempt number says nothing about that: a rework that exists because thebranchartifact could not be used (a short hash, a repository that is no address) has no pushed commit at all, and finishing it with nothing pushed is not leaving a red gate, it is an agent that, told why, has nothing to push. The core now keeps the last commit an earlier attempt of the job pushed (Job.earlier_push, set by the rework, absent on a stored ledger from before, forgotten by the next job) andis_answer(pushed, branch_refused, earlier_push)reads it instead of the attempt. A rework of a pushed commit keeps the old rule exactly (the pushed branch is still the work; "no pushed commit" fails it, now naming the commit, branch and repository that are still the work, so the agent can act on it). Abranchartifact the gate cannot use is still a failed push in the attempt it is sent in (it is what an agent that tried and got it wrong looks like).- "no checks reported" was said first.
agent_checkslooked for thechecksartifact before it looked at the push, so a job whose gate applied with nothing pushed was told to report checks for a tree nobody pushed (B's message). With no pushed commit the finding is now always the no-push reason (and what the failed checks said, after it); "no checks reported" is only for a pushed commit.
| What the job holds when the agent finishes | The gate (2026-10-07) |
|---|---|
no usable branch artifact, none refused, no earlier push (any attempt, any job; whatever else was reported) | does not apply: Done, no verdict of any source |
a branch artifact the gate could not use | applies: "the branch artifact was not usable: <reason>" |
a usable branch artifact | applies as before |
no new branch artifact in a rework of a commit an earlier attempt pushed | applies: "no pushed commit; an earlier attempt pushed commit <12 hex> to branch <b> of <repo>, which is still the work: push the fix there and report the new branch artifact" |
Pre-existing failures pass with a note (C). adam-rs re-runs a failing check on the base commit of the pushed work; when it fails there too the coder marks the finding preexisting: true (with the base commit). The contract is in api/agui.md. The core reads each finding: a string, or an object whose preexisting is the boolean true, is a pre-existing failure; everything else (a missing field, "true", 1) is the agent's to fix, so an older agent behaves exactly as before. A failing report whose findings are all marked passes: check_result is passed, with no findings, and its summary is the agent's own followed by "failing on the base commit <12 hex> too, so not caused by this work: yarn check, ..." (the base commit when a finding or the report names a full hash). A report that fails on something unmarked fails, its findings the unmarked ones followed by one that names the marked ones "leave those": the agent is not sent to fix what it did not break. The pre-existing note is a claim of the agent's, as its checks are: it is not a verdict of CI or of the verifier, which, when required, still judge the commit themselves (the note is the cost, said plainly: an agent that marks a check it broke gets through agent-checks; the gate trusts the mark as it trusts passed, and the base commit named in the summary lets a reviewer re-run it).
What stays. The rework prompt, the fences, the attempt budget, CI and the verifier, checks counting only on the pushed commit, the unusable branch as a failed push. No event, field of an event or wire name changed: Job.earlier_push is a ledger field (omitted when absent, so a ledger stored before it reads as it did; a thread in flight at attempt 2 or 3 with nothing pushed before is now an answer when it finishes without pushing) and ChecksReport gained preexisting and base_commit (the core's own type, not a wire type). orch_core::is_answer changed its third argument from the attempt to "an earlier attempt pushed a commit": a host that calls it (the AG-UI projection is the one in this repository) must pass that, and the projection tracks it as the core does, from the rework events.
Verified 2026-10-07 by tests: the core's a_job_that_pushed_nothing_is_done_in_every_attempt_whatever_checks_came, a_job_after_a_failed_job_is_gated_afresh_and_an_answer_is_still_an_answer, a_rework_after_an_unusable_branch_that_pushes_nothing_is_an_answer, a_rework_of_a_pushed_commit_keeps_it_as_the_work_and_names_it, checks_that_fail_only_on_checks_the_base_fails_too_pass_with_a_note, a_failure_that_is_new_still_fails_and_the_base_failures_are_named_after_it, what_the_gate_does_not_understand_as_preexisting_is_not and pre_existing_checks_on_another_commit_than_the_pushed_one_still_fail (crates/core/tests/gate.rs); the property test's answer rule now reads earlier_push (gate_props.rs); the app's an_investigation_after_a_failed_job_is_an_answer_not_a_failure, a_rework_after_an_unusable_branch_that_pushes_nothing_is_done and checks_that_fail_on_the_base_too_pass_and_the_result_says_which (crates/app/tests/gate.rs). Unverified: that adam-rs's coder writes preexisting and base_commit as described (its change is a separate pull request), and what the exports' first attempt held.
Configuration summary ​
| Variable | Default | Meaning |
|---|---|---|
ORCH_GATE | empty | required sources, comma list of ci, agent-checks, verifier; empty keeps today's behaviour. Built: all three are accepted (ci since slice 6, verifier since slice 10) |
ORCH_MAX_ATTEMPTS | 3 | attempts per job, including the first |
ORCH_MAX_ATTEMPTS_CAP | 10 | the most a target or a thread may raise it to; at most 100. A default ORCH_MAX_ATTEMPTS is lowered to a smaller cap |
ORCH_VERIFIER | none | the verifier agent's id (must be configured and, when the gate requires the verifier, another agent than the one verified; startup error otherwise). Built (slice 10) |
ORCH_VERIFIER_TIMEOUT_SECS | 1800 | how long to wait for a verdict before Blocked, at least 1. Built (slice 10) |
ORCH_VERIFIER_WATCH_SECS | 5 | how often a verification looks at its thread while it waits for the verifier, at least 1; not a policy of the gate, a setting of the dispatcher. Built (slice 10) |
ORCH_CI_TIMEOUT_SECS | 3600 | how long to wait for CI before Blocked (ADR 0017), at least 1; an AGENTS_FILE entry's gate.ci.timeoutSecs overrides it. Read since slice 6 |
ORCH_CI_REQUIRED | none | the names of the CI checks that must pass, comma list; a gate that requires ci must name at least one here or in an entry's gate.ci.required (exit 78 otherwise). Read since the review of 2026-09-30 |
AGENTS_FILE gate | none | per-target override, shape above |
Security notes ​
- Findings are untrusted data. They come from CI, an agent or a verifier and are put in a prompt for the worker. They are quoted and delimited, capped (20 items, 16 KiB per source), and never interpreted as instructions to the orchestrator.
- The gate cannot be weakened from below. A thread's
forwardedPropsorstart_job.gatecan only add sources and lower or raise attempts within the cap; a client cannot remove a required source, so a hostile or careless client cannot turn a gated target into an ungated one. - The verifier cannot complete the job. Its envelopes never become
Input::Agent; only averdictartifact does, as a singleVerifierReported. - Fail closed. No verdict, no checks reported, no pushed commit after a push was attempted: each is a failed check. The agent's own checks are refused as well when they name another commit or none (status note of 2026-09-30, the first live run). Work that was never pushed is not work the gate has an opinion on (status note of 2026-10-04): the job is an answer, never a pass of any source, and no
check_resultsays otherwise. Timeouts block; they never pass. - The attempt cap bounds token and wall-clock spend by construction; the wait timeouts bound the rest.
Consequences ​
Easier
- "Never done while red" is a property the tests can state: never
Donewhile a required source is failed or pending; attempts never exceed the maximum; terminal states absorb; replay is deterministic. - A deployment picks its trust: CI only, or CI plus a verifier, or the agent's own checks for inner loops; nothing else in the design changes.
- The existing behaviour and goldens are unchanged while
ORCH_GATEis empty.
Harder
AgentChecksneeds an adam-rs change (achecksartifact fromrun_checks). Until then it is unusable with the default agent.- The run now stays open longer, so a client sees
RUN_FINISHEDlater than the agent'scompleted; every AG-UI consumer must tolerate it (the reference client does; the web has since slice 4). - Three configuration layers to explain and test. The monotonic rule (may add, may not remove) is the simplification.
- A
Blockedthread from a timeout needs a human; there is no automatic retry of the wait. - A chat is not verified, and the gate cannot tell a forgotten push from an answer. Since 2026-10-04 an agent that finishes its first attempt with no
branchartifact is done, whatever it reported. An agent that was asked for a pull request and forgot to push endsDonewith nothing, as an answer would; only a job that pushed, or tried to, is held to the gate (status note). - The gate does not see everything.
agent-checksis the agent vouching for itself; the orchestrator does not comparepushed.repositorywith what the person asked for and does not refuse acommitequal to the base; onlyciand the verifier look at the commit independently. The holes are listed, with what stands in for each, in the status note of 2026-09-30 ("What the gate still does not check").
Alternatives considered ​
- CI only (the answer proposed with open question 8). Rejected as the only option: repositories without CI, and inner loops, need something faster; it stays one of the three sources.
- A verifier agent only. Rejected: it can diverge from real CI (ADR 0002: an external judge). It is optional here and never replaces a required CI.
- A port for "checks" (a
Verifiertrait). Rejected: the sources are a closed set, and a port would move the aggregation out of the pure core. The verifier is an ordinary A2A agent behind the existingAgentClientport. - A
Reworkingstate. Rejected: a rework is a delegation withattempt > 1, already representable asQueuedorWorking. - Spending an attempt on a timeout. Rejected: a missing CI report is not evidence the code is bad, and burning attempts on infrastructure faults hides them. A timeout blocks and asks.
- Letting a thread remove a required source. Rejected: it would let any client bypass a target's gate.
- Unbounded rework. Rejected by ADR 0002.
Hard to reverse ​
- The
CheckSource,Timer,Input(VerifierFailedincluded) andEventBodyvariants and their serde names inthreads.joband the event log. - Outbox kind
verifyandoutbox.task_id. - The
vymalo.checkandvymalo.reworkactivity schemas once the web and other clients read them. - The
verdictandchecksartifact shapes, which are contracts with other repositories (adam-coder, verifier agents). AGENTS_FILEgatein deployments' manifests.
Easy to reverse: every default, the caps and timeouts.
Verified ​
- Verified 2026-09-30 (adam-rs
882e239): adam-coder's artifacts arebranchandpull_request;run_checksemits none. The coder image used by the dev stack isghcr.io/vymalo/another-adam-rs/coder:sha-882e239@sha256:abd9233d45aef86784c8f986484680d287bf2ee12d5d81f111d4e7030a1e0cb7. - Verified 2026-09-30 (this repository at
a35fa57): the thread states arequeued,working,blocked,done,failed,cancelled; the outbox kinds aredelegateandcancel. - AG-UI facts (
STATE_SNAPSHOT,SUBAGENT_*,RUN_ERROR, activity messages) are asapi/agui.mdrecords them, verified 2026-09-29 there. - Verified 2026-09-30 (this repository, slice 10, against WireMock 3.13.2 standing in for a verifier, and the real binary against it): the request the dispatcher sends a verifier is an A2A
SendStreamingMessagewith the verification context ascontextId, the outbox row id asmessageIdand the prompt inparts[0].text; thedev/wiremock/verifiermappings match exactly that shape (dev/check-mocks.sh,dev/verifier-e2e.sh). - Cross-repository work: adam-coder must emit
checks {passed, commit, summary, findings}fromrun_checks(an adam-rs pull request). Not started.
Status note (2026-10-08): the owner lets the gate pass pre-existing failures ​
Decision. The owner, asked on 2026-10-08 whether the gate should accept failures the coder marks as pre-existing: "yes, let the gate pass preexisting failures".
Why a change was needed. The note of 2026-10-07 reads the mark on each finding. The coder writes it on the report (verified 2026-10-08, adam-rs bin/adam-coder/src/tools/checks.rs at 8e1133d: preexisting: true and base_commit beside passed: false, the findings strings), so a pull request the coder opened on a pre-existing failure still failed agent-checks here (ADR 0014, status note of 2026-10-07).
What changed (orchestrator/crates/core/src/gate.rs, recognise_artifact). A report whose own preexisting is the boolean true marks every finding as pre-existing; a marked report with no finding is named by its summary (or "the checks"). The rest of the 2026-10-07 rule is unchanged: the per-finding mark, the note in the summary, checks counting only on the pushed commit, a mark of any other type not being one, and CI and the verifier judging the commit themselves when required. Tests: orchestrator/crates/core/tests/gate.rs, a_report_the_coder_marks_preexisting_passes_with_a_note and its two neighbours.