ADR 0002 — Verification over consensus ​
- Status: accepted (2026-09-28). Status note (2026-09-30): ADR 0018 makes the verify step and the attempt budget concrete (planned, not built): a configurable gate over CI, agent-reported checks and a verifier agent, 3 attempts by default. It also answers open question 8 and the attempts and wall-clock part of question 6; token budgets stay open. The decision stands.
Context ​
The goal is "agents sit together and craft the perfect solution". Agents discussing among themselves converge on something plausible, and each round multiplies token cost.
Decision ​
Quality is decided by an external judge: tests, typecheck, lints, CI. The loop is work → verify → rework (with findings) until green, bounded by budgets. Review agents critique a diff that already passes. A job never ends "done" while its checks are red.
Consequences ​
- Every job needs acceptance criteria the verifier can check; the planner's first output is criteria, not code.
- Budgets (attempts, tokens, wall clock) are part of job state; exhausting one ends in
Failedwith the findings in the chat.